- Service provider: MeteoViva GmbH
- Product name: MeteoViva Climate
- Certification system: DGNB System for Buildings In Use, Version 2020
- Validity: until October 2028
MORE INFORMATION ON THE PRODUCT
The conformity check for the product 'MeteoViva Climate' was successfully completed. The test result was confirmed in all points after independent evaluation by the certification body of the DGNB.
For further information, see the requirements specification, which summarises the documents to be submitted for certification of follow-up projects based on the recognised service available here.
41.5%Guaranteed degree of fulfilment | + 30.5%Maximum additional degree of fulfilment |
Recognition result in detail
| No. | Criteria and indicators | Guaranteed points | Variable additional points |
|---|
| 1.1 | Target agreement (target value) | 12 | 14 |
|---|
| 1.2 | Level of ambition | 0 | 6 / 8 / 10 / 16 |
|---|
| 2.1 | Collecting data on energy (actual value) | 35 | |
|---|
| 3.1 | Data analysis | 5 | |
|---|
| 3.2 | Implementation of the improvement measures | 5 | |
|---|
| | Measures for optimising operation based on | | |
|---|
| 4.1.1 | technical knowledge and through stakeholder dialogue in regular meetings | 5 | |
|---|
| 4.1.2 | calculation models with customised settings | 4 | |
|---|
| 4.1.3 | technical monitoring | 2.5 | |
|---|
| 4.1.4 | considering environmental, economic and social aspects | 2.5 | |
|---|
| 6.1 | Target achievement: Internal target value | 0 | 5 / 10 |
|---|
| 6.2 | Target achievement: External benchmarking | 0 | 5 |
|---|
| 6.3 | Agenda 2030 Bonus – exemplary energy and climate footprint in operation (the bonus is not listed in the english criteria set, but the points will be taken into account) | 0 | 10 |
|---|
| 7.1 | Agenda 2030 Bonus – carbon neutrality | 0 | 15 / 30 |
|---|
| 7.2 | Agenda 2030 Bonus – use of renewable energy sources (the bonus is not listed in the english criteria set, but the points will be taken into account) | 0 | 5 / 10 |
|---|
| No. | Criteria and indicators | Guaranteed points | Variable additional points |
|---|
| 1.1 | Target agreement (target value) | 0 | 5 / 10 |
|---|
| 1.2 | Water stress | 5 | |
|---|
| 2.1 | Collecting data on water (actual value) | 25 | 30 / 35 |
|---|
| 3.1 | Data analysis | 5 | |
|---|
| 5.1 | Target achievement | 0 | 10 |
|---|
| No. | Criteria and indicators | Guaranteed points | Variable additional points |
|---|
| 1.1.1 | Target agreement | 0 | 5 / 10 |
|---|
| 1.1.2 | Target agreement for separately collected waste fractions | 0 | 5 |
|---|
| 2.1 | Collecting data on waste | 0 | 25 / 30 |
|---|
| 3.1 | Data analysis | 0 | 5 |
|---|
| 5.1 | Target achievement | 0 | 10 |
|---|
| No. | Criteria and indicators | Guaranteed points | Variable additional points |
|---|
| 1.1.1 | Target agreement | 15 | |
|---|
| 3.1 | Cost analysis | 0 | 5 |
|---|
| | Measures for optimising operation based on | 0 | |
|---|
| 4.1.1 | technical knowledge and through stakeholder dialogue in regular meetings | 10 | |
|---|
| 4.1.2 | calculation models with customised settings | 15 | |
|---|
| 4.1.3 | comparing environmental, economic and social aspects | 15 | |
|---|
| 5.1 | Target achievement | 0 | 10 |
|---|
| 6.1 | Evaluating operating cost performance | 0 | 10 |
|---|
| No. | Criteria and indicators | Guaranteed points | Variable additional points |
|---|
| 1.1 | Personnel responsibility | 5 | |
|---|
| 2.1 | Checklist for transparency on building documentation | 5 | |
|---|
| 2.2 | Building inspection | 0 | 7,5 / 10 |
|---|
| 3.2 | Complaint management | 4 | |
|---|
| 3.3.1 | Vacancy rate is documented | 5 | |
|---|
| 3.3.2 | Occupancy density is documented | 5 | |
|---|
| | Potential analysis and climate action roadmap | | |
|---|
| 5.1.2 | Building energy | 6 | |
|---|
| 5.1.3 | User energy | 6 | |
|---|
| 5.1.4 | Supply systems | 6 | |
|---|
| 5.1.5 | Renewable energy | 0 | 10 |
|---|
| 5.1.6 | Based on the analysis a climate action roadmap was compiled | 0 | 10 |
|---|
| 6.1.1 | Short-term action plan is in place | 10 | |
|---|
| 6.1.2 | Financial plan is defined | 5 | |
|---|
| No. | Criteria and indicators | Guaranteed points | Variable additional points |
|---|
| 4.1 | Guideline for technical monitoring | 4 | |
|---|
| | Implementing the guideline for technical monitoring regarding | | |
|---|
| 5.4.1 | new installations | 2 | |
|---|
| 5.4.2 | existing installations | 2 | |
|---|
| No. | Criteria and indicators | Guaranteed points | Variable additional points |
|---|
| 1.1.1 | Target agreement (target value) | 0 | 20 |
|---|
| 1.1.3 | Target agreement complaint management | 5 | |
|---|
| 2.1 | Collecting data on comfort parameters and user information | 0 | 5 / 20 |
|---|
| 3.1 | Data analysis | 10 | |
|---|
| 3.2 | Implementation of improvement measures | 5 | 10 |
|---|
| | Measures for optimising operation based on | | |
|---|
| 4.1.1 | technical knowledge and through stakeholder dialogue in regular meetings | 5 | |
|---|
| 4.1.2 | user surveys and/or complaint management | 5 | |
|---|
| 4.1.3 | calculation models with customised settings | 10 | |
|---|
| 4.1.4 | technical monitoring | 5 | |
|---|
| 4.1.5 | considering environmental, economic and social aspects | 5 | |
|---|
| 6.1 | Target achievement | 0 | 5 / 10 |
|---|
| No. | Criteria and indicators | Guaranteed points | Variable additional points |
|---|
| 1.1.1 | Promotion of user communication | 0 | 5 |
|---|
| 1.1.4 | Information system for displaying consumption data | 0 | 5 |
|---|