General information

- Service provider: ikl GmbH
- Product name: ikl GoldXPress
- Certification system: DGNB System for Buildings In Use, Version 2020
- Validity: until November 2028
MORE INFORMATION ON THE PRODUCT
Our evaluation
The conformity check for the product "ikl GoldXPress" was successfully completed. The test result was confirmed in all points after independent evaluation by the certification body of the DGNB.
For further information, see the requirements specification, which summarises the documents to be submitted for certification of follow-up projects based on the recognised service available here.
66.6%Guaranteed degree of fulfilment | + 21.3%Maximum additional degree of fulfilment |
Recognition result in detail
| No. | Criteria and indicators | Fixed indicator Evaluation (points) | Variable indicator Evaluation (points) |
|---|---|---|---|
| 1.1 | Target agreement | 14 | |
| 1.2 | Ambition of the target, climate protection roadmap | 6 / 8 / 10 / 16 | |
| 2.1 | Collecting data on energy | 30 / 35 | |
| 3.1 | Data analysis | 5 | |
| 3.2 | Implementation of the improvement measures | 0 / 5 | |
| Measures for optimising operation, based on | |||
| 4.1.1 | technical knowledge and through stakeholder dialogue in regular meetings | 5 | |
| 4.1.2 | Calculation programmes with adjustments to actual operation | 4 | |
| 4.1.3 | Technical monitoring | 2,5 | |
| 4.1.4 | Comparison of ecological, economic, and social aspects | 2,5 | |
| 4.1.5 | Measures for optimising operation – Target value of the KSFP | 0/ 14 | |
| 5.1 | AGENDA 2030 BONUS: Life cycle assessment of the design | 0/ 10 | |
| 6.1 | Internal target value | 0 / 5/ 10 | |
| 6.2 | External benchmarking | 0 / 5 | |
| 7.1 | AGENDA 2030 BONUS: Climate neutrality | 0 / 15 / 30 | |
| 7.2 | AGENDA 2030 BONUS: Use of renewable energy sources | 0 / 5/ 10 |
| No. | Criteria and indicators | Fixed indicator Evaluation (points) | Variable indicator Evaluation (points) |
|---|---|---|---|
| 1.1 | Target agreement | 10 | |
| 1.2 | Water consumption index | 5 | |
| 2.1 | Collecting data on water | 30 / 35 | |
| 3.2 | Implementation of the improvement measures | 0 / 10 | |
| Measures for optimisation based on | |||
| 4.1.1 | Expertise, stakeholder dialogue in regularly scheduled meetings | 10 | |
| 4.1.2 | Calculation programmes with adjustments to actual operation | 5 | |
| 4.1.3 | Measures for gray water/rainwater utilization | 0 / 5 | |
| 4.1.4 | Comparison of ecological, economic, and social aspects | 5 | |
| 4.1.5 | Alternatively: Target achievement | 0 / 25 | |
| 5.1 | Achievement of targets for annual drinking water consumption | 0 / 10 |
| No. | Criteria and indicators | Fixed indicator Evaluation (points) | Variable indicator Evaluation (points) |
|---|---|---|---|
| 1.1.1 | Target agreement | 10 | |
| 1.1.2 | Additional target value via fractionation and recycling share | 5 | |
| 2.1.1 | Collection of residual waste quantities and recycling rates | 30 | |
| 2.1.2 | Query waste disposal companies | 5 | |
| 3.1 | Data analysis | 5 | |
| 3.2 | Implementation of improvement measures | 0 / 10 | |
| Measures for optimisation based on | |||
| 4.1.1 | Expertise, stakeholder dialogue in regularly scheduled meetings | 10 | |
| 4.1.2 | Information on waste reduction and the increase of recycling rates | 5 | |
| 4.1.3 | Incentive systems on waste reduction and the increase of recycling rates | 0 / 5 | |
| 4.1.4 | Comparison of ecological, economic and social aspects | 5 | |
| 4.1.5 | Alternatively: Target achievement | 0 / 25 | |
| 5.1 | Achievement of targets for annual drinking water consumption | 0 / 10 |
| No. | Criteria and indicators | Fixed indicator Evaluation (points) | Variable indicator Evaluation (points) |
|---|---|---|---|
| 1.1 | Target agreement | 15 | |
| 2.1 | Collecting data on costs | 15 | |
| 2.2 | Standardised cost structure | 5 | |
| 3.1 | Cost analysis | 5 | |
| 3.2 | Implementation of improvement measures | 0 / 10 | |
| Measures for optimisation based on | |||
| 4.1.1 | Expertise, stakeholder dialogue in regularly scheduled meetings | 10 | |
| 4.1.2 | Calculation programs with adjustments to actual operation | 15 | |
| 4.1.3 | Comparison of ecological, economic, and social aspects | 15 | |
| 4.1.4 | Alternatively: Target achievement | 0 / 40 | |
| 4.2 | AGENDA 2030 BONUS – Raising awareness of CO2 and energy prices | 5 | |
| 5.1 | Target achievement | 0 / 10 | |
| 6.1 | AGENDA 2030 Bonus: Dual assessment of operating cost performance | 0 / 10 |
| No. | Criteria and indicators | Fixed indicator Evaluation (points) | Fixed indicator Evaluation (points) |
|---|---|---|---|
| 1.1 | Personnel responsibility | 5 | |
| 2.1 | Checklist for transparency on building documentation | 5 | |
| 2.2 | Recorded inspections in four areas | 12,5 / 15 | |
| 2.3 | Warranty/maintenance management | 2.5 | |
| 2.4 | Building connectivity | 2.5 | |
| 2.5 | Agenda 2030 Bonus – Generating renewable energy on buildings | 0 / 5 / 10 | |
| 3.1 | User survey | 7 | |
| 3.2 | Comprehensive complaint management | 8 | |
| 3.3.1 | Vacancy rate is documented | 5 | |
| 3.3.2 | Occupancy density is documented | 5 | |
| 3.4 | Agreement on data provision | 0 / 10 | |
| 4.1 | Classification of the three most relevant environmental risks | 15 | |
| 4.2 | Adaptations to the consequences of climate change – implementation of compensation measures/no medium or high environmental risks | 0 / 4 | |
| 4.3.1 | Threat levels at the site – air quality | 2 | |
| 4.3.2 | Threat levels at the site - Radon | 2 | |
| 4.3.3 | Threat levels at the site - Outdoor noise | 2 | |
| 4.4. | AGENDA 2030 BONUS – Climate impact risk analysis | 5 | |
| 5.1.1 | Potential analysis of urban development/districts | 2 | |
| 5.1.2 | Potential analysis of building energy | 6 | |
| 5.1.3 | Potential analysis of user energy | 6 | |
| 5.1.4 | Potential analysis of supply systems | 6 | |
| 5.1.5 | Potential analysis of renewable energy | 10 | |
| 5.1.6 | Climate protection roadmap creation | 10 | |
| 6.1.1 | Creation of a long-term action plan (>10 years) | 15 | |
| 6.1.2 | Preparation of financial plan | 5 |
| No. | Criteria and indicators | Fixed indicator Evaluation (points) | Variable indicator Evaluation (points) |
|---|---|---|---|
| 1.1 | Guideline on hazardous and risky substances | 8 | |
| 1.2 | Guideline on Responsible Resource Extraction and Secondary Raw Materials | 6 | |
| 1.3 | Guideline on dismantling and recycling friendliness | 6 | |
| 1.4.1 | Construction Waste Directive: Requirements for waste fractions to be separated | 4 | |
| 1.4.2 | Construction Waste Directive: Requirements for on-site recycling and reuse quantities | 4 | |
| 2.1.1 | Management policy: Requirements for the efficiency of electrical products | 4 | |
| 2.1.2 | Management guideline: Requirements for sustainable cleaning | 4 | |
| 2.2.1 | Guideline for selecting suppliers and service providers: Requirements for sustainability aspects | 4 | |
| 2.2.2 | Guidelines for selecting suppliers and service providers: preference for local suppliers | 4 | |
| 3.1.1 | Biodiversity Directive: Requirements for dealing with invasive plant species | 4 | |
| 3.1.2 | Biodiversity Directive: Requirements for the promotion and protection of native animal species | 4 | |
| 3.1.3 | Biodiversity guideline: Requirements for greening facades and roof areas | 4 | |
| 3.1.4 | Biodiversity Directive: Requirements for the maintenance contract | 4 | |
| 4.1 | Guideline on Technical Monitoring | 4 | |
| Implementation of guidelines on maintenance and expansion | |||
| 5.1.1 | Hazardous & high-risk substances | 0 / 2 | |
| 5.1.2 | Responsible resource extraction and secondary materials | 0 / 2 | |
| 5.1.3 | Ease of dismantling and recycling | 0 / 2 | |
| 5.1.4 | Construction waste | 0 / 2 | |
| 5.1.5 | Alternatively: No maintenance and/or expansion measures carried out | 0 / 8 | |
| Implementation of the directive on sustainable management | |||
| 5.2.1 | Electrical efficiency requirements when purchasing electrical products | 0 / 3 | |
| 5.2.2 | Requirements for selecting sustainable cleaning products | 0 / 3 | |
| 5.2.3 | Requirements for social standards and sustainability aspects when selecting suppliers and service providers | 0 / 3 | |
| 5.2.4 | Requirements regarding the location of suppliers and service providers | 0 / 3 | |
| Implementation of the Biodiversity Directive | |||
| 5.3.1 | Requirements for invasive plant species | 0 / 3 | |
| 5.3.2 | Promotion and protection of native animal species | 0 / 3 | |
| 5.3.3 | Greening of facades and roof surfaces | 0 / 3 | |
| 5.3.4 | Maintaining functional condition and ecological quality through a maintenance contract | 0 / 3 | |
| Implementation of the Technical Monitoring Directive | |||
| 5.4.1 | Technical monitoring for systems that are newly installed as part of maintenance and expansion measures | 0 / 2 | |
| 5.4.2 | Technical monitoring also for existing systems that have a significant impact on the building's energy consumption | 0 / 2 | |
| 6.1 | Life cycle assessments for expansion and maintenance measures | 0 / 5 |
| No. | Criteria and indicators | Fixed indicator Evaluation (points) | Variable indicator Evaluation (points) |
|---|---|---|---|
| 1.1.1 | Target agreement (target value) | 20 | |
| 1.1.2 | Target agreement User satisfaction survey | 5 | |
| 1.1.3 | Target agreement for complaint management | 5 | |
| 2.1 | Collection of measurement data and user information | 15 / 20 | |
| 3.1 | Data analysis | 10 | |
| 3.2 | Implementation of improvement measures | 0 / 10 | |
| Measures for optimising operation based on | |||
| 4.1.1 | Expertise, stakeholder dialogue in regularly scheduled meetings | 5 | |
| 4.1.2 | Complaint management | 5 | |
| 4.1.3 | From calculation models with adjustments to actual operation | 5 | |
| 4.1.4 | Technical monitoring | 5 | |
| 4.1.5 | Gegenüberstellung ökologischer, ökonomischer und sozialer Aspekte | 5 | |
| 4.1.6 | Alternatively: Target achievement | 0 / 10 / 20 | |
| 5.1 | AGENDA 2030 Bonus - Komfortparameter | 4 | |
| 6.1 | Target achievement | 0 / 5 / 10 |
| No. | Criteria and indicators | Fixed indicator Evaluation (points) | Variable indicator Evaluation (points) |
|---|---|---|---|
| 1.1.1 | Promotion of user communication | 5 / 10 | |
| 1.1.2 | Sustainability guide | 5 | |
| 1.1.3 | Information signs for behavioral change | 5 | |
| 1.2 | Promoting user interaction | 1 | 0 / 10 |
| 3.3 | Overall concept for increasing accessibility | 10 | |
| 4.1 | Health services | 0 / 10 |
| No. | Criteria and indicators | Fixed Indicator Evaluation (Points) | Variable Indicator Evaluation (Points) |
|---|---|---|---|
| 2.1.3 | Parking facilities - Maintenance facilities | 0 / 5 | |
| 3.2.2 | Map showing the location of the stops | 5 | |
| 4.1.1.1 | Mobility management strategy with adequate provision of charging stations | 5 | |
| 4.1.1.2 | Charging infrastructure at the building Option A: Implementation of mobility strategy | 0 / 10 |